I promised some pictures. There are so many more I could share, but here is a glimpse. I will get some more posted tomorrow! The clinic has been painted, electric installed, doors hung and septic has been dug. The grass has even been planted in between the two buildings. The cupboards are left to hang, toilets and sinks to be installed and the ground to be smoothed out front. It's looking good!

You can see why we need this facility to be done. This was a pre and post natal teaching class we held while the medical team was here. There were over 130 ladies with their babies!

3 Comments